In these few days, my flooring is completed and almost all skirting is up. K has been wadsapp-ing pictures everyday, probably because there was one day that he did not wadsapp me pictures and I casually asked him if he didn't go down because it was his birthday (I knew that it was his birthday and was teasing him). HAHA. He replied saying that he actually did go down but 'there was nothing to take'. So since then, I get pictures everyday, even though progress wasn't that fast, just flooring.
Day 18
Flooring continued into the MBR.
Day 19
Day 20
The air-con guys came over to do piping.
The pipes went through the room, wasn't too bad.
But there was no avoiding ugly piping leading to the air-con ledge at MBR.
Day 18
Flooring continued into the MBR.
Day 19
Day 20
The air-con guys came over to do piping.
The pipes went through the room, wasn't too bad.
But there was no avoiding ugly piping leading to the air-con ledge at MBR.