Monday, June 18, 2012

.::. Week 2 concluded .::.

We visited our place on Saturday evening, and was pleased with the progress.  =)

IMG_9599

This is the view that greeted us once we stepped into the house.  The kitchen curbs are up and cement screed has dried up.

IMG_9602

Our living room, with the partition for recess wall prepared.

IMG_9617

From the end of the living room.

IMG_9606

Master Bed Room's false ceiling is also prepared.

IMG_9612

The tiny MBR toilet.

IMG_9608

View from MBR - weather was great and people were jogging in the park.

IMG_9613

View from corridor showing the master bed room and study.  The hole will be filled with our wardrobe which will also act as a 'wall' between the 2 rooms.

IMG_9622

My brick wall!

IMG_9625

All the materials and protection for flooring.
IMG_9623

View from entrance and end of tour for the week.

Week 3 will be flooring week, after which the carpentry guy can come and measure and confirm our designs soon.  I supposed all major works should be completed by Week 3, awaiting carpentry to come in and other minor works such as shower screens, curbs and doors.  Hopefully we can get the walls hacked in Week 3 too!  Air-con guy will come and do piping on Saturday.

I'm loving how the home is turning out.  I guess the feel will be complete once the flooring is done.