.::. Week 5 concluded .::.

Not that much was done this week since most of the works are completed. The glass/shower screen is installed, paint work is almost done and all debris cleared for chemical cleaning next week.

IMG_9772

View from entrance.

IMG_9777

Living/Dining area.

IMG_9783

View from common toilet entrance/service yard.

IMG_9789

Common toilet.

IMG_9793

The MBR which we painted grey.  Because I like to sleep in absolute darkness and prefer dark bedrooms.  A huge contrast to the bright and white living and dining area.

IMG_9794

Air-con trunking and beams.  The space is where my wardrobe will be.

IMG_9799

The tiny MBR toilet.

IMG_9803

The corridor.

IMG_9804

View from sofa area.

IMG_9808

Our L-box and recess wall which will become a feature wall.

We have chosen doors for the toilets. A 2 panel door for MBR toilet as the space is absolutely too tiny, a sliding door and louvre bi-fold door for the common toilet. These should be installed next week. Windows should also come soon.

The relative has also came to do a site visit and some measurements. We have decided on our laminates and carpentry design for all. Hopefully we can get them installed by the end of the month, but we are still waiting for finalized design (hopefully they didn't get anything wrong) and for the carpenter to do the actual measurements early next week. I was a little disappointed because they didn't have cement-screed like laminates which I wanted for the bathrooms. *sigh. Let's just hope that carpentry can be delivered by the end of the month, otherwise our renovation will drag for more than 8 weeks.

I need the house to be ready soon, because my room is becoming a store room!

We've got quite abit of stuff from the Robinsons sale including things like chinese wok, bedsheets, towels, quilt etc.. 