Progress is slowing down as there's not much left to do now. Chemical cleaning was done, my toilet doors and service yard window is up. Carpenter also finally came for measurements after a nasty email was sent out, threatening to change carpenter.
It's really amazing how they can simply refuse to reply and give any timeline nor explanation. Till now, we still have no confirmation that delivery at the end of the month can be met. And the most ridiculous thing is, they are telling me my contractor is 'lazy' when he has finished most works in 4-5 weeks and they are the one who has dragged my carpentry for 2 week with no response nor follow-up. We're waiting for carpentry to be up before getting K to install lights since some switches and lights had to be concealed into carpentry.
I'm so sick of all these, and wish with all my heart that this could end soon. It has caused so much unhappiness, frustrations and wasted so much of my precious time. And it's problematic since prices have not been quoted or finalized. I've no clue how everything is going to work out, since reviews are bad and we have had no confirmation or schedule of works/installations. *sigh.
On a happier note, I'm loving how the place has turned out!
View of the living/dining/kitchen. I love how spacious and bright the area is, since it's where the guests will mingle.
MBR toilet door changed as the original door was too huge, it hits the sink and vanity. Elbows will also hit the door if it's not closed. Chose this door as we felt that it enhances the look, instead of PD or bi-fold doors.
The common toilet 2-panel sliding doors. I love them!
View of the huge common toilet and the other entrance to service yard. We're getting a louvre bi-fold door as it looks nicer than normal bi-fold doors. We needed something that opens outwards since we're having a full-length vanity.
And here's our corridor of white walls. =)
Let's just hope that everything will work out fine and they'll deliver at the end of the month as requested.
It's really amazing how they can simply refuse to reply and give any timeline nor explanation. Till now, we still have no confirmation that delivery at the end of the month can be met. And the most ridiculous thing is, they are telling me my contractor is 'lazy' when he has finished most works in 4-5 weeks and they are the one who has dragged my carpentry for 2 week with no response nor follow-up. We're waiting for carpentry to be up before getting K to install lights since some switches and lights had to be concealed into carpentry.
I'm so sick of all these, and wish with all my heart that this could end soon. It has caused so much unhappiness, frustrations and wasted so much of my precious time. And it's problematic since prices have not been quoted or finalized. I've no clue how everything is going to work out, since reviews are bad and we have had no confirmation or schedule of works/installations. *sigh.
On a happier note, I'm loving how the place has turned out!
View of the living/dining/kitchen. I love how spacious and bright the area is, since it's where the guests will mingle.
MBR toilet door changed as the original door was too huge, it hits the sink and vanity. Elbows will also hit the door if it's not closed. Chose this door as we felt that it enhances the look, instead of PD or bi-fold doors.
The common toilet 2-panel sliding doors. I love them!
View of the huge common toilet and the other entrance to service yard. We're getting a louvre bi-fold door as it looks nicer than normal bi-fold doors. We needed something that opens outwards since we're having a full-length vanity.
And here's our corridor of white walls. =)
Let's just hope that everything will work out fine and they'll deliver at the end of the month as requested.