Tuesday, June 19, 2012

.::. Renovation Day 15 - 16 .::.



Day 15

Flooring started! K sent me a picture.

IMG_4038

Day 16

Flooring for the living room is almost completed.

IMG_9663

View from the entrance.

IMG_9664

Close-up view.

IMG_9665

They still need to mend the gaps/grouting.

IMG_9666

From the other end of the living room.

IMG_9674

IMG_9676

IMG_9677

IMG_9680

Still very dirty.

IMG_9682

View from the corridor.

IMG_9683

IMG_9684

IMG_9691

Brick wall.

IMG_9687

This is where they cut the tiles.

IMG_9692

Home.  =)

Does it have a Scandinavian feel?

I think I like it, not 'WOAH' kind of impressed, but satisfied with how it had turned out.  Obviously it wouldn't be as pretty as using real wood, but it's pretty impressive for homogeneous tiles.  I'm alright with the color too.  The husband thinks the planks looked short, but I guess we've made the best choice as longer tiles have warping issues.

Choosing wood-like flooring for our home:

We wanted wooden flooring for the whole house, including kitchen - that one we were sure.  But what we weren't sure was what material to use.  We've looked around and shortlisted quite a few:

Laminates: Big no-no for me, because I dislike the way it feels when you step on it.  It feels 'fake' and hollow, and it's not known to be durable too.  Definitely not recommended for kitchen.  I suppose the only reasons people choose it is due to its affordability and patterns available.  Cost $2.50psf and up.

Parquet wood: Not recommended for kitchen due to dampness/leaks, although overseas use it for kitchen and it's the top 5 materials to be used. Gave it up since everyone advised against it and we were concerned about the maintenance.  Moreover, it's usually darker colored which would make our place look smaller. Cost $6psf and up.

Bamboo: Supposed to be more durable and more resilient to water, but was also advised against using it for kitchen as hot oil would change its color. Expensive to lay it for whole house.  Think it cost about $7psf and up.

Vinyl: Also known as waterproof resilient flooring.  It feels solid, looks like wood and is waterproof.  I was amazed and totally sold - till I went to research on it.  It's made of vinyl, basically plastic and installed using a 'floating' system as pieces are 'clicked' together.  Warranty on the material, but salesman warned that it does not cover mould if water manage to go UNDER it.  This is possible as the pieces are not sealed and if your mop is too wet/air con leak/forget to close windows, water can and will seep in between and potential cause mould or smell.  Moreover, some studies stated that vinyl is 'poisonous' and emits poisonous fumes which is especially bad for children.  Reviews overseas were pretty bad too. Smelly flooring doesn't sound appealing to me, so we gave it up. Cost $5.60psf and up.

Homogeneous tiles: We knew about wood-like homogeneous tiles but I was concerned about the grouting or whether it could have the feel that I like.  We went to quite a few places - White Horse, Hafary and Soon Bee Huat.  We eventually chose our tiles from Soon Bee Huat for $2.60psf excluding  laying.  Hafary had a few nice ones to but prices start from $3.20.  White horse had less options and generally didn't look as nice due to the grains.  Soon Bee Huat had a huge selection, and the showroom has big areas which were laid with such tiles for easy visualization too.  Really worth a visit for anyone choosing tiles!




Monday, June 18, 2012

.::. Week 2 concluded .::.

We visited our place on Saturday evening, and was pleased with the progress.  =)

IMG_9599

This is the view that greeted us once we stepped into the house.  The kitchen curbs are up and cement screed has dried up.

IMG_9602

Our living room, with the partition for recess wall prepared.

IMG_9617

From the end of the living room.

IMG_9606

Master Bed Room's false ceiling is also prepared.

IMG_9612

The tiny MBR toilet.

IMG_9608

View from MBR - weather was great and people were jogging in the park.

IMG_9613

View from corridor showing the master bed room and study.  The hole will be filled with our wardrobe which will also act as a 'wall' between the 2 rooms.

IMG_9622

My brick wall!

IMG_9625

All the materials and protection for flooring.
IMG_9623

View from entrance and end of tour for the week.

Week 3 will be flooring week, after which the carpentry guy can come and measure and confirm our designs soon.  I supposed all major works should be completed by Week 3, awaiting carpentry to come in and other minor works such as shower screens, curbs and doors.  Hopefully we can get the walls hacked in Week 3 too!  Air-con guy will come and do piping on Saturday.

I'm loving how the home is turning out.  I guess the feel will be complete once the flooring is done.

.::. Renovation Day 8-12 .::.

K sent pictures of his people working on my brick wall.

IMG_3961

IMG_3960

The brick wall is completed!

As I went to collect my lights, I dropped it at our place in the evening.

IMG_3963

The track lights.

IMG_3966

The down lights.

IMG_3969

My brick wall is wrapped up in plastic to protect it from cement screeding.

IMG_3970

And this is the war zone.

There was inefficient sand for cement screeding and Day 10 was spent replenishing sand.

By Day 11, my cement screeding is all completed!

IMG_3979

Day 12 was curbs and false ceiling/L-box prep day.

It's been almost 2 weeks and our hacking permit for the walls between the kitchen and service yard is still not approved.  After hounding HDB for days days straight, we finally got a response - PE is needed.  Asking around, I realized that everyone needed to get a PE for those walls.  I don't quite understand why it took HDB 2 weeks to tell us that we need a PE!?  Our technical officer wasn't around for the whole week, and by the 3rd day, I was so annoyed that HDB is still asking me to leave my number and wait for my technical officer to call me.  Upon probing, they went to check and realized that he was on reservice.  It was only after I asked for the covering officer that they finally gave us a reply.  *sigh.  So inefficient!  I asked that HDB officer - if my technical officer is on reserve the whole month or 2 weeks, does that mean that I'll have to simply wait?!

That's HDB for you.  

Thursday, June 14, 2012

.::. Time .::.

I've been surviving on very little sleep these 2 months.  I sleep for about 5-6 hours on weekdays, and don't have much time to repay my sleep debt during the weekend because it's always a mad rush - going to meed IDs/contractors, visiting furniture shops and now checking on our renovation progress.

Weekday nights I'm doing research about all sort of things from deco ideas, to which contractor/IDs to use, to comparing market prices and reviews, to choosing tiles and which materials to be used.  Then, now that we have decided on renovation and deco, it's what brand/model of fridge, hob, hood, air-con, heater and fans to buy.  Even after deciding on the brand/model, I start looking for the exact place to buy it, comparing prices and checking reviews.  It's really no joke, and the learning curve is really steep.

Now, I can easily rattle off about pro/cons about using gas/induction hobs, different brands and models of hoods, different washers/dryers, storage/instant/gas heaters, where to find furniture and lights or air-con.  Basically, I'm immersed in everything renovation.

I really wished I had more time for everything.  I'm trying to read books about 'Fengshui' these days, and looking for nice deco items for our place.  We've got our air-con and arranged for the first delivery of piping.  We've also short-listed our hob/hood/ceiling fan/fridge/TV console/side tables/coffee table/bench/lights/bed.  We've placed deposit for our mattress/air-con/sofa/dining table/sideboard.

I vaguely remembered wanting to blog about the Nepal trip, but before I had the chance to do it, it's already *gasps* 3 months since I got back.  Has it really been 3 months ago?!

Where has all my time gone to?

Tuesday, June 12, 2012

.::. Sky .::.

IMG_3971

I love the sky.  I always remember to look up and admire its beauty.

Yesterday, just before i fell asleep, I had some random thoughts.

Life's too short, I must be happy everyday.
Life's too short, I will not shortchange myself.
Life's too short, I would like to...do something else with my life.

Monday, June 11, 2012

.::. Week 1 Concluded .::.

Some works were done on Saturday, and no works on Sunday.

We dropped by on Saturday evening, after spending the afternoon at Lorgans (I love love love the furniture there).

This is how our place look like after one week of renovations. Progress has been fast and I'm really very pleased.



IMG_9568


The corridor flanked by my lovely brick walls.


Cement screed completed in study room and MBR with hacked wall mended. Electrical points are also ready for false ceiling.


IMG_9571


The study room.


IMG_9572


Study and corridor screeded.


IMG_9573


Another perspective.


IMG_9574


IMG_9585


My MBR toilet mosaic wall.


IMG_9575


My common toilet mosaic wall.


IMG_9577


My lovely brick wall.


IMG_9589


The war zone.


IMG_9582


IMG_9584


IMG_9593


I'm loving my place, and I'm really excited about seeing it take shape.  *cross fingers and hope that everything goes smoothly*


I have been visualizing my home for months, planning and deciding on all the nitty gritty details with the husband.  It's really exhilarating to see your dreams materializing bit by bit.


There's so much to decide on, too many choices and decisions to make.  We were asked, if we would like to lay our tiles horizontal or vertical, where you want to place your switches, how far apart should the bricks be laid, exactly how do we want our lights to be spaced apart..and we'll have to start designing our carpentry, what compartments we would like, the color and materials etc..We also had to go around looking for our mattress (what brand, size, range, softness), what furniture and which shops to go.


Electronics are worst! From the washing machine to fridge, to air-con, to hood and hob, to heater and lights.  We've been trying to research on the brands/models/pricing/functionality and which shops to buy them from even after we've decided on a particular model.  IT IS REALLY TIRING!

I keep thinking that we've chosen almost everything needed, then I realized, we haven't chose paint color, curtains and rods, and there's still many many little things to buy.  Goodness!

But...I'm so thankful to have this chance to go through all these with the husband, so I'm not complaining. =)


.::. Renovation Day 5 .::.

Dropped by in the morning around 9 plus and the workers were already hard at work.

To my delight, my brick wall was already work-in-progress!

IMG_3874

IMG_3881

They also started with my mosaic wall in the toilet too!

IMG_0043

Cement screeding has also started..

It's a joy to watch these people at work, for they take pride in their work and these are professional skills which most of us disregard these days..every single tile is laid on and adjusted with precision..and the guy who was doing my cement screed look like he's dancing with his spade as his movements were so smooth and rhythmic..

IMG_0044

Another room was also screeded when I was there in the evening.

IMG_0050

one brick wall and one mosaic wall in the toilet is also completed.

Wednesday, June 6, 2012

.::. Renovation Day 2-3 .::.

Day 2

Not much works were done on Day 2.  They simply went to dismantle the showers and toilet bowls to prepare for overlaying.  K wadsapp-ed me pictures once it was done - real-time updates which I really appreciate.

IMG_3825

We didn't go down since nothing much was done.

Day 3

The electricians came in the afternoon and they started on the electrical works according to the drawing I provided.  I used a lot of Chinese, to ensure that my contractor understood.  Little did I anticipate that the electricians weren't Chinese.  =/

I went down after work to confirm the points.  We're asking for so many switches everywhere, 2-way switches for almost all the lights plus many additional points.

IMG_3834

The war zone. Some electrical points were up, but there's still a lot more to be done.

IMG_3838

All points for the MBR is up.

IMG_3841

To my horror, they wanted to put my light switches on the side of my brick wall.  I'm totally horrified. No way I am going to have a big hole with all the switches there!  The switches will be right beside my TV and very ugly.  They are going to move it to the side of the wall tomorrow.

IMG_3835

And this is the toilet wall which will be overlaid with my favorite mosaic tiles.

They'll be continuing with electrical works and also starting tiling works tomorrow.  I'm excited!

IMG_3812

I like this light.  No idea what is it called or where can I find it.

IMG_3816

I also like the exposed plywood.

IMG_3843

Oh, and this is the Fengshui layout for our estate!  We unknowingly got a unit with the 'best' fengshui!

http://www.geomancy.net/phpforum/article.php?bid=2&fid=43&mid=31109&s=4

IMG_3845

And because I'm abit concerned about our front door directly facing the service yard window, I'm reading up on it to minimize the impact.  I suppose that it's not as bad as our unit has a good fengshui position.  It's bad because the chi coming into the flat from the front door will go right out from the window without circulating into the house.

After some initial read-up, ways to improve things:
- Add plants at the window (no thorns!)
- Crystals help to slow down the chi and let it flow into the house
- Add a wall or partition (impossible!)
- Add blinds/curtains and do not open your windows often

However, most importantly, one must be comfortable.  I'm not comfortable with adding a partition or wall, as I like bright and spacious areas.  It can sometimes be symbolic, and I may just add a small crystal at the entrance (maybe at the light) or hang a plant from the ceiling in front of the window.

There's so much to read about.

- No mirrors facing the door.
- No pictures facing doors
- No mirrors facing beds
- No beds facing doors
- No beds facing windows
- Good to have a light at the entrance
- Good to have bright and spacious rooms with happy things in the house
- Good to have plants at the entrance

Gonna try to avoid the bad things and follow the good things if it's pretty and I feel comfortable about it.  =)