Monday, June 18, 2012

.::. Renovation Day 8-12 .::.

K sent pictures of his people working on my brick wall.

IMG_3961

IMG_3960

The brick wall is completed!

As I went to collect my lights, I dropped it at our place in the evening.

IMG_3963

The track lights.

IMG_3966

The down lights.

IMG_3969

My brick wall is wrapped up in plastic to protect it from cement screeding.

IMG_3970

And this is the war zone.

There was inefficient sand for cement screeding and Day 10 was spent replenishing sand.

By Day 11, my cement screeding is all completed!

IMG_3979

Day 12 was curbs and false ceiling/L-box prep day.

It's been almost 2 weeks and our hacking permit for the walls between the kitchen and service yard is still not approved.  After hounding HDB for days days straight, we finally got a response - PE is needed.  Asking around, I realized that everyone needed to get a PE for those walls.  I don't quite understand why it took HDB 2 weeks to tell us that we need a PE!?  Our technical officer wasn't around for the whole week, and by the 3rd day, I was so annoyed that HDB is still asking me to leave my number and wait for my technical officer to call me.  Upon probing, they went to check and realized that he was on reservice.  It was only after I asked for the covering officer that they finally gave us a reply.  *sigh.  So inefficient!  I asked that HDB officer - if my technical officer is on reserve the whole month or 2 weeks, does that mean that I'll have to simply wait?!

That's HDB for you.  

Thursday, June 14, 2012

.::. Time .::.

I've been surviving on very little sleep these 2 months.  I sleep for about 5-6 hours on weekdays, and don't have much time to repay my sleep debt during the weekend because it's always a mad rush - going to meed IDs/contractors, visiting furniture shops and now checking on our renovation progress.

Weekday nights I'm doing research about all sort of things from deco ideas, to which contractor/IDs to use, to comparing market prices and reviews, to choosing tiles and which materials to be used.  Then, now that we have decided on renovation and deco, it's what brand/model of fridge, hob, hood, air-con, heater and fans to buy.  Even after deciding on the brand/model, I start looking for the exact place to buy it, comparing prices and checking reviews.  It's really no joke, and the learning curve is really steep.

Now, I can easily rattle off about pro/cons about using gas/induction hobs, different brands and models of hoods, different washers/dryers, storage/instant/gas heaters, where to find furniture and lights or air-con.  Basically, I'm immersed in everything renovation.

I really wished I had more time for everything.  I'm trying to read books about 'Fengshui' these days, and looking for nice deco items for our place.  We've got our air-con and arranged for the first delivery of piping.  We've also short-listed our hob/hood/ceiling fan/fridge/TV console/side tables/coffee table/bench/lights/bed.  We've placed deposit for our mattress/air-con/sofa/dining table/sideboard.

I vaguely remembered wanting to blog about the Nepal trip, but before I had the chance to do it, it's already *gasps* 3 months since I got back.  Has it really been 3 months ago?!

Where has all my time gone to?

Tuesday, June 12, 2012

.::. Sky .::.

IMG_3971

I love the sky.  I always remember to look up and admire its beauty.

Yesterday, just before i fell asleep, I had some random thoughts.

Life's too short, I must be happy everyday.
Life's too short, I will not shortchange myself.
Life's too short, I would like to...do something else with my life.

Monday, June 11, 2012

.::. Week 1 Concluded .::.

Some works were done on Saturday, and no works on Sunday.

We dropped by on Saturday evening, after spending the afternoon at Lorgans (I love love love the furniture there).

This is how our place look like after one week of renovations. Progress has been fast and I'm really very pleased.



IMG_9568


The corridor flanked by my lovely brick walls.


Cement screed completed in study room and MBR with hacked wall mended. Electrical points are also ready for false ceiling.


IMG_9571


The study room.


IMG_9572


Study and corridor screeded.


IMG_9573


Another perspective.


IMG_9574


IMG_9585


My MBR toilet mosaic wall.


IMG_9575


My common toilet mosaic wall.


IMG_9577


My lovely brick wall.


IMG_9589


The war zone.


IMG_9582


IMG_9584


IMG_9593


I'm loving my place, and I'm really excited about seeing it take shape.  *cross fingers and hope that everything goes smoothly*


I have been visualizing my home for months, planning and deciding on all the nitty gritty details with the husband.  It's really exhilarating to see your dreams materializing bit by bit.


There's so much to decide on, too many choices and decisions to make.  We were asked, if we would like to lay our tiles horizontal or vertical, where you want to place your switches, how far apart should the bricks be laid, exactly how do we want our lights to be spaced apart..and we'll have to start designing our carpentry, what compartments we would like, the color and materials etc..We also had to go around looking for our mattress (what brand, size, range, softness), what furniture and which shops to go.


Electronics are worst! From the washing machine to fridge, to air-con, to hood and hob, to heater and lights.  We've been trying to research on the brands/models/pricing/functionality and which shops to buy them from even after we've decided on a particular model.  IT IS REALLY TIRING!

I keep thinking that we've chosen almost everything needed, then I realized, we haven't chose paint color, curtains and rods, and there's still many many little things to buy.  Goodness!

But...I'm so thankful to have this chance to go through all these with the husband, so I'm not complaining. =)


.::. Renovation Day 5 .::.

Dropped by in the morning around 9 plus and the workers were already hard at work.

To my delight, my brick wall was already work-in-progress!

IMG_3874

IMG_3881

They also started with my mosaic wall in the toilet too!

IMG_0043

Cement screeding has also started..

It's a joy to watch these people at work, for they take pride in their work and these are professional skills which most of us disregard these days..every single tile is laid on and adjusted with precision..and the guy who was doing my cement screed look like he's dancing with his spade as his movements were so smooth and rhythmic..

IMG_0044

Another room was also screeded when I was there in the evening.

IMG_0050

one brick wall and one mosaic wall in the toilet is also completed.

Wednesday, June 6, 2012

.::. Renovation Day 2-3 .::.

Day 2

Not much works were done on Day 2.  They simply went to dismantle the showers and toilet bowls to prepare for overlaying.  K wadsapp-ed me pictures once it was done - real-time updates which I really appreciate.

IMG_3825

We didn't go down since nothing much was done.

Day 3

The electricians came in the afternoon and they started on the electrical works according to the drawing I provided.  I used a lot of Chinese, to ensure that my contractor understood.  Little did I anticipate that the electricians weren't Chinese.  =/

I went down after work to confirm the points.  We're asking for so many switches everywhere, 2-way switches for almost all the lights plus many additional points.

IMG_3834

The war zone. Some electrical points were up, but there's still a lot more to be done.

IMG_3838

All points for the MBR is up.

IMG_3841

To my horror, they wanted to put my light switches on the side of my brick wall.  I'm totally horrified. No way I am going to have a big hole with all the switches there!  The switches will be right beside my TV and very ugly.  They are going to move it to the side of the wall tomorrow.

IMG_3835

And this is the toilet wall which will be overlaid with my favorite mosaic tiles.

They'll be continuing with electrical works and also starting tiling works tomorrow.  I'm excited!

IMG_3812

I like this light.  No idea what is it called or where can I find it.

IMG_3816

I also like the exposed plywood.

IMG_3843

Oh, and this is the Fengshui layout for our estate!  We unknowingly got a unit with the 'best' fengshui!

http://www.geomancy.net/phpforum/article.php?bid=2&fid=43&mid=31109&s=4

IMG_3845

And because I'm abit concerned about our front door directly facing the service yard window, I'm reading up on it to minimize the impact.  I suppose that it's not as bad as our unit has a good fengshui position.  It's bad because the chi coming into the flat from the front door will go right out from the window without circulating into the house.

After some initial read-up, ways to improve things:
- Add plants at the window (no thorns!)
- Crystals help to slow down the chi and let it flow into the house
- Add a wall or partition (impossible!)
- Add blinds/curtains and do not open your windows often

However, most importantly, one must be comfortable.  I'm not comfortable with adding a partition or wall, as I like bright and spacious areas.  It can sometimes be symbolic, and I may just add a small crystal at the entrance (maybe at the light) or hang a plant from the ceiling in front of the window.

There's so much to read about.

- No mirrors facing the door.
- No pictures facing doors
- No mirrors facing beds
- No beds facing doors
- No beds facing windows
- Good to have a light at the entrance
- Good to have bright and spacious rooms with happy things in the house
- Good to have plants at the entrance

Gonna try to avoid the bad things and follow the good things if it's pretty and I feel comfortable about it.  =)

Tuesday, June 5, 2012

.::. Renovation Starts! .::.

Today was our first day of renovation, and we've got so much done. I received pictures from K once I arrived at work. He told me that he will start at 10, but was already moving the materials up to our place by 930am.

Pre-renovation week
- Apply for HDB permit to hack walls
- Got the permit in 2 days
- Confirmed tiles
- Activated utilities

Day 1
- All sand and tiles are already delivered.
- All hacking done with debris cleared.
- Toilet plastic partition removed
- Toilet door removed.
- Prep for brick wall done.

:good: for K's efficiency.
I dropped by during lunch, and they have already finished hacking the wall, and was about the start clearing the debris and dismantle my toilet partition and doors.

When I dropped by in the evening, all debris were cleared and my wall was prep-ed for my bricks!




IMG_3794

The sand and cement.

IMG_3799

My tiles!  I seem to like it more and more.

IMG_3810

Hacked wall in MBR.

IMG_3806

Hacked wall in kitchen/living room.

IMG_3804

Wall all prep-ed for my brick wall!

IMG_3808

Ugly toilet partition removed.

K brought a malay couple over to look at our tiles when I was there during lunch, and they gave me this amazing idea to knock down another wall at the kitchen yard to further 'open up' the kitchen. I was instantaneously taken in by the idea, despite knowing that it would cost quite abit more to hack both walls, add a window, overlay the service yard and make good the wall. The husband came down to see after work and agreed. Greedy me added a cement screed wall in the kitchen to perfect things. :dribble: It's amazing that my mum and a random stranger has given the best space-planning advice for our renovation! IDs are not always worth the money. :unsure:

K will be helping us to submit another permit tomorrow and do another round of hacking thanks to my fickle-mindedness. :P

Everything seem to fall into place and I think I'm satisfied now. I always felt like something was missing, as we weren't doing anything to our service yard, and that area seemed to be isolated. With this additional works, I think I've pretty much achieved all that I wanted. :sport-smiley-004: :dancingqueen:


White brick wall
Cement screed wall
Black chalk board wall (bomb shelter)
Wooden flooring (with tiles)
Pure white kitchen
Mosaic wall (x2!!)


i'm really thankful that things have been going smoothly after all the pre-reno issues. Choosing the right person to do up your place really makes a huge difference to your whole renovation experience. 

Saturday, June 2, 2012

.::. Shopping Spree .::.

Just a short one before I concuss.  I'm sleeping later and later these days, it's like I'm surviving on adrenaline rush.  I'll probably stay this way till we move into our new place.

I went to Bugis to baibai for our renovation before meeting Chye to get my cheongsum done.  Got a good lot, and hopefully everything will go smoothly from now onwards.

I've been cracking my head to choose all sort of things these days.  There are so many things to know and to choose!  Even making my cheongsum had so many possibilities, designs, cuts and colors.  Luckily Chye was with me, which makes it a little easier since I trust her taste.  I'm not very confident about carrying a cheongsum off, but I like the idea of having something traditional during the wedding.  After all, weddings are traditional and it's probably the only time that I'll consider wearing one.  Hopefully it'll turn our pretty.  Since I wanted the 20% early bird discount, my dress will only be ready in Dec/Jan, not in time for our pre-wedding shoot.

Then, I went shopping at Robinsons after Chye went for her dinner date.  Robinsons is having some ridiculous sales with discounts on top of discounts plus vouchers and rebates given.  I spent quite a few hours in there and bought quite a few things for the house!  I got us bedsheets which were on 40% + 15% sale, the Kenwood water boiler which I really like, some colorful mixer bowls and strainer, cutlery which was 6 for $10 (cheap!), 2 beautiful (expensive) towels, a small chef pan, a cooking wok and some little stuff.  It's a struggle telling myself to buy only things that I really like and not spend too much unnecessarily. It cost me almost $600 after the discounts, but it was pretty worth it!  The extra discounts are only till this weekend.  Luckily they provided free delivery, otherwise it'll be impossible for me to carry all those back.

The husband is still happily in China, sightseeing during the weekend and drinking every single night!  He doesn't sound very sober and laughed at my auntiness.  I'm helping to save money okay!

There's still seemingly 101 things to buy.  Lights, air-con, hood/hob, TV, bed frame, console...and the list goes on.

Friday, June 1, 2012

.::. Pre-Renovation .::.

We've got our hdb permit yesterday, just 2 days after K (our contractor) submitted our application! *weee. I'm really happy about it. I love it that K's quick and efficient, since i work fast too and working with someone who drags my stuff would drive me crazy.

K has happily informed us that he'll start work and start hacking the walls on Monday. Electrical works will follow. The utilities people have activated our electricity and water today. I'm really impressed by the convenience of activating water and power! When we got our keys, hdb told us that we had to go back to hdb to activate our utilities. but since i'm lazy, i tried to google it and realized that i only need to call. It was a 5-minute call, give details, address, set appointment, then it's done. You just need to be there for an hour slot to test and they'll send you the utility bill, including deposit needed. Fuss free!

Since both of us may not be able to visit the site often, and i'm a worry wart, I drew our electrical drawing for K. It's not tt i don't trust him, just that sometimes really will forget or miss out. It's also an easier way to communicate our wants. Since the picture is color coded and complete with chinese words, i'm sure the electrician can follow. i did it and the husband vetted it. we changed it quite a few times till we were sure that we did not miss out anything. 


noname-1

And when I'm happily proud of what I've done, I met up with one of K's ex-customer and realized that the electrician is not Chinese! I totally didn't thought of that.  Looks like my drawing is not as useful as I thought! *sigh!


noname-2


This is the drawing I did for the hacking, just in case K does not remember or the workers did not understand.  I'm just being paranoid and cautious!

K's laughing at me whenever he sees my drawings and kept assuring me that nothing will go wrong.  I told him that I'll kill him if he hacks the wrong wall.  He's super efficient, and has already got my tiles.  I suppose that we can finish hacking and electrical in Week 1, and at this rate, tiling will probably be done by Week 2.  *yay

I'm pretty reassured after hearing his ex-customer share her experience with K. He's really quite funny yet efficient and honest.

I'm so relieved and thankful that we can start work soon.  Really.  Can't wait to our dream home materialize.  =)



Tuesday, May 29, 2012

.::. The Renovation Saga .::.

We have finally finalized our renovation details last Saturday, and I am so thankful for that.  We have had many issues, mainly because the MIL insisted that we let the relative do the carpentry work.  It was so frustrating for us, and led to a whole week of arguments which left all of us really tired. MIL initially said that we can look around and also consider the relative before choosing. But when she knew that we were going to finalize things with another contractor, bypassing the relative, she spent a whole week trying to persuade us to use the relative. It wasn't pretty. We had to give in to appease the MIL, and to me, it's a lose-lose situation and was very unpleasant for all involved.

We originally wanted to use the relative for our renovations, since he offered to do it for us at minimal profits.  Cost was an issue as we're on a budget. We did look around before going to him, just to get more suggestions and know the market rates.  But in the end, we decided not to let him do our renovations due to many reasons.

April Week 2: We went to discuss the works needed, which were pretty straightforward since we were already sure about of what we wanted.

April Week 4: He finally came back with the quote, with quite a few items missing or extra.

May Week 1: We went down to discuss and adjust the quote, waited for over 2 hours. Discussion fell flat as he wasn't willing to negotiate and insisted that he has never done any project with such low profit margins.  He also said that he did not want to do our business nor earn our money.

May Week 3: No news.

An item in contention is this fee for dismantling of plastic partition in toilet.  We were charged $320 for it and find it unreasonable since some neighbours have dismantled it by themselves easily.  Husband argued with him, and he insisted that it's reasonable because of the manpower and disposal required. Husband wasn't happy about it and told him that he will do it himself instead. Plumbing works were also around $1300, which we find really expensive.  I was also unhappy about the price of this hob - he charged $310 while I was quoted $215 including delivery from outsiders.  List prices in shops were also $280.  And he said that we'll be given a good price as he's a distributor!  In short, both of us weren't very happy about how things went. The relative also agreed to adjust the quote accordingly, and we took a wait-and-see attitude.

After that unpleasant meeting with the relative, I suppose both of us knew in our heart that it's not working out.  The quote wasn't cheap, there was no room for discussion and he was taking very long to get back to us.  Reviews online was less than flattering, and we really felt that there will be delays and many complications with no recourse if we were to use him.  Perhaps that's why many people do not encourage using relatives for renovations to avoid such issues.

We started meeting with a few other contractors after that meeting, mostly contractors who were recommended from renotalk or friends.  All of the quotes (all in) were cheaper than what the relative quoted. Moreover, the relative's quote does not include haulage(~1k), electrical works (~3k), and the top-up for smaller and more expensive tiles(~1k).

After 2 weeks of meeting contractors, both of us chose the contractor whom we were most comfortable with and had experience in similar themes.  Everything was effortless and enjoyable.  The first time I called him, he immediately made an appointment to view the site. He was early, and I like that because being on time tells you something about a person.  He came with a measuring tape and a small notebook, and talked quickly, moving around efficiently.  He went around, giving us suggestions and telling us what was feasible and what was desirable.  He didn't even measure much things nor took down any notes! It was apparent that he's very experienced and knew what he was doing. It took about an hour and he left, promising to give us a quote.

In 3 days or so, I received a round-figure quote from him.  Within the week, the detailed quote was also sent to me. We've more or less decided on him when we met him again at the site again 3rd week of May.  We made some adjustments to our required works, and he came back with the quote in a day.  



By now, the MIL found out that we are on the verge  of confirming the contractor and started insisting that we use the relative, at least for the carpentry because he had his own factory and offered internal laminates. We weren't keen as we preferred one contractor coordinating everything and really would like to avoid any more negotiation and complications with the relative. The MIL called me and spoke non-stop for a whole 30 minutes till the husband took the phone from me.  No matter what I said, she simply kept insisting that we let the relative do our carpentry.  Then there's the 'don't give her face' talk. She even told me things like all contractors are out to con me, that they are only nice now because they want my business. Once I sign up with them, they'll not be as nice anymore. It's like we are really naive little kids who know not we were doing. And seriously, of course I would give my business to people who really want it instead of people who does not want it right?!

We did not want to use the relative because:
1. He does not seem to want our business, no follow-up on the adjustments required after 3 weeks.
2. We were concerned about delays, complications and lack of recourse. See 1.
3. We prefer one contractor overseeing everything.
4. We were really tired of waiting and negotiating as we have made no headway the past 5 weeks.
5. We were supposed to be quoted at minimal profit, but it does not seem to be the case and it's not worth the trouble.

It was impossible to decline, no matter how hard we tried.  I've never seen the husband so angry nor so fierce in the past 8 years together.  In his words, 'it's like world war three is coming'. So he spent the week arguing with the MIL day and night, and he finally caved in and ask the relative for a quotation by the next day based on the carpentry work we required. The main point in contention is PVC vs laminates insides. MIL insists that PVC is bad and poisonous, although we really don't care nor mind.

We did get a 'quotation' the next day, which was pretty much exactly the same quote which was given to us 3 weeks ago, without any adjustments! It pissed me off, because we waited 2 hours to discuss the adjustments needed! After 3 weeks, we were still at the same place and no adjustments were done. Moreover, the husband asked explicitly for the quotation of that few carpentry items, but got a huge excel sheet instead.  I'm not sure what went wrong, but it really wasn't working and both us us were really upset.

After receiving the 'quote' I wrote an email to all parties involved, asking for their understanding and respect no matter what decision we made.  We decided not to use the relative afterall, since again, no quote was given for the carpentry and it wasn't cheap. The discounted quote came to 35k, but did not take into account any adjustments we wanted, does not include haulage and electricity nor the more expensive tiles  It wasn't worth the trouble at all, and it's impossible to get our renovation done smoothly at this rate.  It was not possible to go back to him - imagine how long more would it take to finalize all our works required. I shudder when I think of going through everything again. The husband called the relative and he seemed alright with it.  Yet, the MIL continued arguing with the husband and insisted that they will match our contractor prices. *sigh.  Both of us were really weary now, and I was like 'whatever, just let him do it if he can match the prices'. We were simply so sick of this - something so simple could be made so complicated with everyone feeling frustrated and upset.  What's the point?

In the end, we drafted a contract with our exact requirements and price for them to sign within the same day.  If we can't come to an agreement by Friday, we will confirm things with our contractor by Saturday.  They did agree to our contract and we will only pay when we are satisfied with the works.   The terms ain't bad and we have nothing to lose in a way, but it was really an unpleasant experience. The relative still commented that our contractor prices were expensive, although I don't think that it's fair to compare his own factory prices to our contractor who uses a sub-con. Similarly, our contractor's wet works were so much cheaper.  But anyway, this was not solely about prices and our contractor's all-in price  (at a healthy margin) was about 20% less compared to his price (at a supposedly minimal margin).

Meanwhile, our contractor, K was very understanding about our situation.  He gave us 2 quotations, one with and one without carpentry.  He even advised us to let the relative do it to avoid trouble. He also answered all my enquires about the materials he uses to achieve the look we wanted, although he knows that he'll not be doing our carpentry.  He still volunteered to go down and coordinate things with our carpenter if needed.  *sigh. Working with him is really enjoyable and effortless, and I'm really thankful to have found such a great contractor.

So, we finally did confirm everything by Saturday as the husband was flying off on Sunday. We marked out the electrical points and handed the flat to our contractor.  We should be all set to start very soon!

I hope and pray that everything goes well from now on.  I pretty much trust K to do our renovations well after seeing his workmanship and befriending his previous customers.  Worst case senecio is having problems and delays with our carpentry and not having them done before the 7th month.  Oh well, since I can't anticipate and prevent anything, I'm just going to enjoy the process and excitement for now. I'm totally relying on the husband to settle the carpentry side of things, and I wish not to be involved.



I guess one big take away from this saga is to avoid doing business with closed ones.  Perhaps we shouldn't even have agreed to approach him at all.  


But most importantly, both of us know that issues and arguments like this will not be the last when the MIL has such a character and insist on putting her leg into everything we do for whatever reason.


Thank god for giving us our own place! Otherwise, we probably wouldn't have got married and I'd rather stay single and buy my own place at 35 than move into his place. I totally anticipated issues like that and it's going to be pathatic if I'd rather stay out than go 'home'. *sigh. Why is everything so difficult?  Sometimes it really feels like our lives is like a drama. It really takes all my faith and inner strength to stay sane during times like this.


For now, I'm going to immerse myself in renovations and enjoy this exciting period with the husband.  =)

Sunday, May 20, 2012

.::. Beautiful Kitchen Sink .::.




Jonathan Adler for Kohler sink.

This is amazingly beautiful!  I love it, it's the perfect shade!  I don't think the husband will be very thrilled about my interest in this though. I'm going to end up with a boring stainless steel sink.  If it was my place, I am definitely going to get it.